• Independent ESIA for 765 kV Dasu Transmission Line Project, Pakistan, 2019.
  • Detailed Feasibility study including Geotechnical Investigation, Environmental Impact Assessment (EIA), Social Impact Assessment (SIA) & Disaster Impact Assessment (DIA) Study of Proposed 2 x 600 MW (or above) in first phase and 2 x 600 MW (or above) in second phase Ultra-Supercritical (USC) Coal Fired Power Plant at Pekua, Cox’s Bazar, April-September, 2018.
  • ESIA for Coal Transportation, Dredging Operation, Morphological Aspect, Jetty and Breakwater Construction for 2X660 MW Coal Based Thermal Power Plant Project.
  • Environmental and Social Management Framework (ESMF) for Power System Reliability and Efficiency Improvement Project.
  • Management Support Consultancy for Padma Multi-purpose Bridge Project.
  • Occupational Health and Safety in Dasu Hydropower Implementation Project.
  • Independent Environmental Impact Assessment of Balochistan Integrated Water Resources Management and Development Project.
  • Environmental and Social Impact Assessment for Coal Transportation of 1,320MW Maitree Coal Fired Power Stations.
  • EIA for Ghorashal Thermal Power Plant Unit 4 Repowering to Combined Cycle, Bangladesh.
  • Independent Environment Review of the River Bank Improvement Project, Bangladesh
  • Independent Validation and Updation of the existing Social and Environment Safeguard Documents as per Guidelines of World Bank prepared by the Guddu Barrage Rehabilitation Design Consultants, Pakistan
  • Independent ESIA for Water Intake Works on Shire River, Water Treatment Works, Pump Stations, Pipelines and Reservoirs
  • World Bank funded South Asia Eastern Corridor Regional Transport and Trade Facilitation Project
  • World Bank funded Environmental and Social Impact Assessment for Upgrading the Kidunda Dam and Access Road
  • IFC funded Environmental and Social Assessment of Almaty Ring Road Project
  • AfDB funded Operational Guidelines of Coal Fired Power Generation.